Solutions
Evidence-Backed Intelligence for Engineering, Compliance and Operations
Beyond search and chat, kiLM packages governed intelligence into four solution families — Engineering Digital Thread & Change Assurance, Enterprise Knowledge & Data Intelligence, Compliance & Product Assurance, and Governed Agents & Operational Intelligence — delivered through one horizontal Intelligence Delivery Layer, on a dedicated single-tenant deployment you control.
Engineering Digital Thread & Change Assurance
Decision-grade intelligence over your governed engineering data: change-impact analysis, digital-thread traversal, verification-and-validation coverage, BOM rationalisation candidates and simulation reuse — results qualified by your available trace and connector coverage.
Scope this solution
Change Impact Advisor
Before you approve an engineering change (ECO / ECR), see what it touches. Given a changed part, requirement or parameter, kiLM walks the trace graph, bill of materials, knowledge graph and policy across every connected domain and returns a de-duplicated impact graph — with per-node severity and confidence — plus a what-if checklist. Read-only, access-scoped, and qualified by your available trace and connector coverage.
- Cross-domain blast-radius for any part, requirement or parameter change.
- Per-node severity and confidence, plus a what-if simulation checklist.
- Read-only and access-scoped — reviewers only see entitled domains.
V&V Coverage Checker
Know exactly which requirements are verified — and which are not. kiLM ingests ReqIF and SysML / XMI, plus supported TestRail and Xray exports (live API connectivity is separately configured and validated), builds the SATISFY / VERIFY / COVERS traceability edges, and folds them into live coverage ratios, gaps and a verification-and-validation health verdict — supporting coverage analysis and audit-evidence preparation for programmes held to standards such as ISO 26262 and DO-178.
- Requirements-to-test coverage matrices built from your own sources.
- SATISFY / VERIFY / COVERS traceability over a governed evidence graph.
- Coverage gaps and a V&V health verdict to support ISO 26262 / DO-178 audit-evidence preparation.
BOM Intelligence
Rationalise your parts. kiLM extracts and reconciles bills of materials across systems and surfaces reviewable duplicate, consolidation and reuse candidates through entity resolution and graph link-prediction — decision support for stewardship, not automatic resolution.
- Cross-system BOM extraction and reconciliation.
- Duplicate / near-duplicate candidates via entity resolution + graph AI.
- Consolidation and reuse candidates for review — not automatic merges.
Simulation Memory
Stop re-running what you already know. kiLM indexes simulation metadata and selected extracted results — depending on format and connector depth — so engineers can ask “have we simulated this before?” and find prior runs, conditions and results through hybrid search.
- Searchable memory of CAE / FMU / CAD simulation metadata and selected results.
- “Have we simulated this before?” over your own analysis history.
- Reuse prior conditions and results instead of re-computing.
Enterprise Knowledge & Data Intelligence
One governed view across the systems you already run: a governed data fabric with intelligent extraction, federated answers over operational systems, golden-record candidate management, data quality and reconciliation, and an intelligence layer for legacy systems.
Scope this solution
Golden Record
One reviewable version of each entity. kiLM proposes a canonical registry of your customers, suppliers, parts or products and surfaces duplicate and merge candidates for stewardship review — a read-only decision aid, not an operational MDM master or automatic merge.
- Proposed canonical records for customers, suppliers, parts or products.
- Cross-system duplicate and merge candidates for stewardship review.
- A governed reference report downstream processes can consult.
Warehouse Operations & Logistics Intelligence
Governed trade-item catalog and delivery assurance across order, inventory, shipment and delivery. kiLM anchors each market item to a checksum-valid JAN/GTIN identifier and traces it through your operational records — with the source document behind every value. External product and market data stays Bring-Your-Own-Data; kiLM does not bundle or license a GS1 registry.
- Checksum-valid JAN/GTIN (GTIN-13 / GTIN-8) trade-item registry — identifiers kept as text so leading zeroes survive.
- Order, inventory, shipment and delivery tracking with the evidence behind each record.
- Bring-Your-Own-Data product and market snapshots — no bundled GS1 registry; catalog and import run air-gapped.
Project Management Intelligence
Governed project controls and delivery assurance layered above the planning, engineering, financial and work-management systems you already run. kiLM is not a task board and does not replace Microsoft Project or Primavera — schedule and earned-value mathematics stay deterministic, and AI explains status without ever authoring authoritative project state.
- Delivery assurance over your existing planning, engineering, financial and work-management systems.
- Deterministic schedule and earned-value math — AI explains, it never authors authoritative project state.
- Bring-Your-Own-Data file exports (CSV / XLSX / neutral XML) as the air-gap MVP; binary .mpp and live Jira / P6 connectors are not included.
Compliance & Product Assurance
Prove conformance with evidence, not assertion: obligation lifecycle management, continuous compliance scanning, findings, remediation and audit-evidence packs, software supply-chain intelligence (SBOM / CSAF), and supplier and contract conformance where source coverage is configured.
Scope this solution
Obligation Tracking
Never miss a commitment. kiLM extracts obligations and deadlines from contracts and regulations, tracks each through its lifecycle, and links it back to the source clause — supporting compliance evidence and auditability rather than proving certification.
- Obligations and deadlines extracted from contracts and regulations.
- Lifecycle tracking with owner, due date and status.
- Every obligation linked back to its source clause.
Governed Agents & Operational Intelligence
Turn governed intelligence into governed action: Agent Studio with approval-gated actions, MCP / API delivery into enterprise applications, evidence-backed reports and program briefs, and — in preview — Expert Finder and change Watchlists.
Scope this solution
Expert Finder
Find who knows. The data foundations — the people / organization domain and context-graph memory — connect people to the work they have touched (documents, decisions and domains). The dedicated expertise-ranking product surface is in preview.
- Locate subject-matter experts by the work they have touched.
- Built on the people / organization domain and context-graph memory.
- Evidence-grounded, access-scoped suggestions.
Watchlists
Planned. Subscribe to the entities that matter and be notified when a change affects them, combining the impact engine with governed notifications and scheduled digests. This capability is on the roadmap and shown here as a preview of intent.
- Subscribe to parts, Requirements, suppliers or documents.
- Change-triggered alerts powered by the impact engine.
- Governed notifications and scheduled digests.
Intelligence Delivery Layer
The horizontal delivery layer beneath all four families. Over the Model Context Protocol and the kiLM API, approved clients — your agents, copilots and enterprise systems (PLM, ERP, MES, ticketing, in-house LLM apps) — receive kiLM's governed answers, evidence and impact graph in place. The governed corpus remains in the customer's dedicated deployment; only policy-authorized, request-scoped outputs are returned to approved clients, through gated, egress-controlled tools.
- An MCP server exposes kiLM search, chat, change-impact and traceability to your peripheral Systems.
- Access-scoped and licensed — every outbound answer honours the same governance and entitlements as the platform.
- In-place and boundary-respecting — only policy-authorized, request-scoped outputs are returned; the governed corpus stays in your deployment.
Dedicated, Single-Tenant & Sovereign — Under Every Solution
Every family above runs in your own dedicated, single-tenant deployment, on infrastructure you choose, with on-premises and air-gap options. It is a cross-cutting assurance rail beneath the solutions — not a separate product.
Put Your Enterprise Knowledge to Work
Every solution here runs inside your deployment, on infrastructure you choose. Tell us the systems, sources and governed outcome you need, and we'll scope the right first solution — with its modules, connectors and validation plan.